Overhead electrical lines exceeding AC 1 kV - National Normative Aspects (NNA) for SLOVAKIA (based on EN 50341-1:2012) Ingestion-build-71203 parents groups and consumer groups
$161.00
Description
parents groups and consumer groups
lot classification and testing schedule will depend upon the requirements of the application for which the welding consumable is being procured
These guidelines are based on the operation and maintenance practices that have been used successfully during the last decades at HVDC converter stations all over the world
bi-fuel or dual-fuel applications) using gaseous fuels in accordance with ISO 9162
Overhead electrical lines exceeding AC 1 kV - National Normative Aspects (NNA) for SLOVAKIA (based on EN 50341-1:2012) Ingestion-build-71203 parents groups and consumer groups1 Scope 1. 1 General (ncpt) SK. 1 New overhead line As a new overhead line is considered a brand new electric overhead line with nominal voltage exceeding 1 kV AC, between the points A and B. The new branch line of the existing overhead line shall be considered as a new overhead line except for a junction support for which the specific requirements shall be defined in the Project Specification. The extent of application of this standard in respect of
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.