3" Drain Cap Compression Points After the Push Point is
$167.50
Description
After the Push Point is attached to the pipe
The actual diameter of this part is 2" in
4) The Bullet Mole shafts are extracted and the pipe or conduit is pulled into the hole behind them simultaneously
The digging hook can be attached to any digging bar that has a square
3" Drain Cap Compression Points After the Push Point isAfter the pipe or conduit is installed over the shafts, this part is used to center the pipe or conduit onto the back end of the shafts. Then as the tool is driven through the ground the 3" drain cap actually pushes the pipe into the hole simultaneously as the Bullet Mole pierces the ground and advances under the pavement.
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.